{"id":1230,"date":"2025-12-23T12:27:00","date_gmt":"2025-12-23T12:27:00","guid":{"rendered":"https:\/\/psglghana.com\/?p=1230"},"modified":"2025-12-23T12:27:03","modified_gmt":"2025-12-23T12:27:03","slug":"scopeofworkfor-structural-rehabilitation-and-fabrication-works-on-mill-b-trash-screen-cv7-head-chute-and-mill-spout-structure","status":"publish","type":"post","link":"https:\/\/psglghana.com\/?p=1230","title":{"rendered":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>1.&nbsp;<\/strong><strong>INTRODUCTION<\/strong><strong><\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute&nbsp;at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to international&nbsp;engineering&nbsp;standards,&nbsp;ensuring&nbsp;structural&nbsp;integrity,&nbsp;durability,&nbsp;and&nbsp;compliance&nbsp;with safety requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Contractor is responsible for conducting all site measurements and preparing fabrication\/erection drawings for written approval by PSGL prior to fabrication and installation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2.&nbsp;<\/strong><strong>SCOPE OF <\/strong><strong>WORK<\/strong><strong><\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The&nbsp;rehabilitation&nbsp;works&nbsp;shall&nbsp;include,&nbsp;but&nbsp;not&nbsp;be&nbsp;limited&nbsp;to,&nbsp;the&nbsp;following&nbsp;activities:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2.1&nbsp;<\/strong><strong>Site<\/strong><strong>&nbsp;<\/strong><strong>Preparation<\/strong><strong>&nbsp;<\/strong><strong>and<\/strong><strong>&nbsp;<\/strong><strong>Access<\/strong><strong><\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Conduct\u00a0a\u00a0detailed\u00a0site\u00a0assessment\u00a0and\u00a0verify\u00a0all\u00a0dimensions\u00a0prior\u00a0to\u00a0fabrication.\n<ul class=\"wp-block-list\">\n<li>Provide\u00a0scaffolding,\u00a0hoisting,\u00a0and\u00a0access\u00a0arrangements\u00a0in\u00a0accordance\u00a0with\u00a0safety standards.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2.2&nbsp;<\/strong><strong>Dismantling<\/strong><strong>&nbsp;<\/strong><strong>and<\/strong><strong>&nbsp;<\/strong><strong>Replacement<\/strong><strong><\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Controlled removal of deteriorated structural elements of the Trash Screen, CV07 Head Chute, and Mill Spout Structures.<ul><li>Provide\u00a0temporary\u00a0supports\u00a0and\u00a0bracing\u00a0during\u00a0dismantling\u00a0and\u00a0replacement\u00a0to\u00a0ensure stability of adjacent structures.<\/li><\/ul>\n<ul class=\"wp-block-list\">\n<li>Prepare\u00a0existing\u00a0foundations\u00a0and\u00a0interfaces\u00a0for\u00a0installation\u00a0of\u00a0new\u00a0members.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2.3&nbsp;<\/strong><strong>Fabrication<\/strong><strong>&nbsp;<\/strong><strong>Drawings<\/strong><strong>&nbsp;<\/strong><strong>and<\/strong><strong>&nbsp;<\/strong><strong>Steel<\/strong><strong>&nbsp;<\/strong><strong>Works<\/strong><strong><\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Prepare and submit fabrication and erection drawings, based on site measurements, for\u00a0written approval by PSGL prior to cutting or welding.<ul><li>Supply,\u00a0fabricate,\u00a0and\u00a0install\u00a0all\u00a0materials\u00a0as\u00a0specified\u00a0in\u00a0the\u00a0attached\u00a0BoQ.<\/li><\/ul>\n<ul class=\"wp-block-list\">\n<li>Execute\u00a0all\u00a0fabrication\u00a0and\u00a0installation\u00a0works\u00a0in\u00a0line\u00a0with\u00a0approved\u00a0drawings\u00a0and\u00a0Welding Procedure Specifications (WPS).<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2.4&nbsp;<\/strong><strong>Welding<\/strong><strong>&nbsp;<\/strong><strong>and<\/strong><strong>&nbsp;<\/strong><strong>Fabrication<\/strong><strong><\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Carry\u00a0out\u00a0cutting,\u00a0edge\u00a0preparation,\u00a0alignment,\u00a0welding,\u00a0and\u00a0grinding.\n<ul class=\"wp-block-list\">\n<li>Ensure\u00a0welding\u00a0consumables\u00a0are\u00a0suitable\u00a0for\u00a0the\u00a0specified\u00a0materials\u00a0and\u00a0comply\u00a0with AWS\/ASME standards.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2.5&nbsp;<\/strong><strong>Non-Destructive<\/strong><strong>&nbsp;<\/strong><strong>Testing<\/strong><strong>&nbsp;<\/strong><strong>(NDT)<\/strong><strong><\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Perform\u00a0Visual\u00a0Testing\u00a0(VT),\u00a0Dye\u00a0Penetrant Testing\u00a0(PT),\u00a0Magnetic Particle Testing\u00a0(MT), and Ultrasonic Testing (UT) on welds and connections.\n<ul class=\"wp-block-list\">\n<li>Submit\u00a0full\u00a0QA\/QC\u00a0reports for\u00a0Client\u00a0approval.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2.6&nbsp;<\/strong><strong>Surface<\/strong><strong>&nbsp;<\/strong><strong>Preparation<\/strong><strong>&nbsp;<\/strong><strong>and<\/strong><strong>&nbsp;<\/strong><strong>Painting<\/strong><strong><\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Blast-clean\u00a0steel\u00a0surfaces to\u00a0ISO 8501-1\u00a0SA 2.5.<ul><li>Apply\u00a0an\u00a0approved\u00a0protective\u00a0coating\u00a0system.<\/li><\/ul>\n<ul class=\"wp-block-list\">\n<li>Provide\u00a0manufacturer\u00a0data\u00a0sheets\u00a0(MDS)\u00a0and\u00a0coating\u00a0inspection\u00a0records.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2.7&nbsp;<\/strong><strong>Labor,<\/strong><strong>&nbsp;<\/strong><strong>Logistics,<\/strong><strong>&nbsp;<\/strong><strong>and<\/strong><strong>&nbsp;<\/strong><strong>Safety<\/strong><strong><\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Provide\u00a0skilled and\u00a0unskilled\u00a0manpower as\u00a0per\u00a0BoQ.\n<ul class=\"wp-block-list\">\n<li>Comply\u00a0with PSGL\u2019s\u00a0HSE\u00a0requirements, including\u00a0PPE, signage,\u00a0firefighting\u00a0equipment,<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">and&nbsp;first&nbsp;aid.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ensure\u00a0transportation,\u00a0accommodation,\u00a0and\u00a0feeding\u00a0of\u00a0personnel\u00a0throughout\u00a0the\u00a0contract.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2.8&nbsp;<\/strong><strong>Erection<\/strong><strong>&nbsp;<\/strong><strong>Methodology<\/strong><strong>&nbsp;<\/strong><strong>and<\/strong><strong>&nbsp;<\/strong><strong>Commissioning<\/strong><strong><\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Submit\u00a0a\u00a0detailed\u00a0erection\u00a0methodology\u00a0and\u00a0lifting\u00a0plan\u00a0for\u00a0written\u00a0approval\u00a0by\u00a0PSGL\u00a0prior to execution.<ul><li>Conduct\u00a0joint\u00a0inspection\u00a0with\u00a0PSGL\u00a0representatives\u00a0upon\u00a0completion.<\/li><\/ul>\n<ul class=\"wp-block-list\">\n<li>Submit\u00a0all\u00a0as-built\u00a0drawings,\u00a0test\u00a0reports,\u00a0and\u00a0certification\u00a0documents.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>3.&nbsp;<\/strong><strong>STANDARDS<\/strong><strong>&nbsp;<\/strong><strong>AND<\/strong><strong>&nbsp;<\/strong><strong>COMPLIANCE<\/strong><strong><\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">All works shall be executed in conformity with the latest editions of the following standards (or approved equivalents):<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>AWS\u00a0D1.1\u00a0\/\u00a0ASME\u00a0Section\u00a0IX\u00a0\u2013\u00a0Welding\u00a0procedure\u00a0and\u00a0welder\u00a0qualifications<\/li>\n\n\n\n<li>ASME\u00a0Section\u00a0V\u00a0\u2013\u00a0Non-Destructive\u00a0Testing\u00a0requirements<\/li>\n\n\n\n<li>ISO\u00a08501-1\u00a0\u2013\u00a0Surface\u00a0preparation\u00a0(SA\u00a02.5)<\/li>\n\n\n\n<li>API\u00a0650 \u2013\u00a0Reference\u00a0guide\u00a0for\u00a0welded\u00a0steel\u00a0structures<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>4.&nbsp;<\/strong><strong>DELIVERABLES<\/strong><strong><\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">At&nbsp;completion,&nbsp;the&nbsp;Contractor&nbsp;shall&nbsp;provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fabrication and erection drawings (based on site measurements) approved in writing by PSGL<\/li>\n\n\n\n<li>Welding\u00a0Procedure\u00a0Specifications\u00a0(WPS),\u00a0PQRs,\u00a0and\u00a0welder\u00a0qualification\u00a0records<\/li>\n\n\n\n<li>NDT reports<\/li>\n\n\n\n<li>Material\u00a0certificates\u00a0and\u00a0traceability\u00a0documentation<\/li>\n\n\n\n<li>Coating\u00a0data\u00a0sheets\u00a0and\u00a0inspection\u00a0reports<\/li>\n\n\n\n<li>Final\u00a0as-built\u00a0drawings\u00a0and\u00a0completion\u00a0dossier<\/li>\n<\/ul>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>5.&nbsp;<\/strong><strong>PROJECT <\/strong><strong>DURATION<\/strong><strong><\/strong><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">The rehabilitation works shall be completed within two (2) weeks from the date of site handover and mobilization, unless otherwise agreed in writing.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>6.&nbsp;<\/strong><strong>EXCLUSIONS<\/strong><strong><\/strong><\/h1>\n\n\n\n<p class=\"wp-block-paragraph\">The&nbsp;following&nbsp;are&nbsp;excluded&nbsp;from&nbsp;this&nbsp;scope&nbsp;unless&nbsp;expressly&nbsp;stated&nbsp;in&nbsp;the&nbsp;contract:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Major\u00a0civil\u00a0works\u00a0beyond\u00a0minor\u00a0foundation\u00a0repairs<\/li>\n\n\n\n<li>Electrical\u00a0and\u00a0instrumentation\u00a0works<\/li>\n\n\n\n<li>Supply\u00a0of\u00a0permanent\u00a0lifting\u00a0equipment\u00a0or\u00a0facilities<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Prepared&nbsp;by:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ing.&nbsp;Julius&nbsp;Agbenyega&nbsp;Ekuadzi,<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;Mechanical&nbsp;Engineering&nbsp;Head, Prestea Sankofa Gold Limited.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>1.&nbsp;INTRODUCTION This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute&nbsp;at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1230","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"1. INTRODUCTION This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"psglghana\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/psglghana.com\/?p=1230\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Prestea Sankofa Gold Limited -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE. - Prestea Sankofa Gold Limited\" \/>\n\t\t<meta property=\"og:description\" content=\"1. INTRODUCTION This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/psglghana.com\/?p=1230\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/psglghana.com\/wp-content\/uploads\/2023\/04\/logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/psglghana.com\/wp-content\/uploads\/2023\/04\/logo.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-12-23T12:27:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-12-23T12:27:03+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE. - Prestea Sankofa Gold Limited\" \/>\n\t\t<meta name=\"twitter:description\" content=\"1. INTRODUCTION This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/psglghana.com\/wp-content\/uploads\/2023\/04\/logo.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230#blogposting\",\"name\":\"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE. - Prestea Sankofa Gold Limited\",\"headline\":\"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE.\",\"author\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/psglghana.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/logo.png\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/#articleImage\",\"width\":732,\"height\":234},\"datePublished\":\"2025-12-23T12:27:00+00:00\",\"dateModified\":\"2025-12-23T12:27:03+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230#webpage\"},\"articleSection\":\"Uncategorized\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/psglghana.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/psglghana.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?cat=1#listItem\",\"name\":\"Uncategorized\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?cat=1#listItem\",\"position\":2,\"name\":\"Uncategorized\",\"item\":\"https:\\\/\\\/psglghana.com\\\/?cat=1\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230#listItem\",\"name\":\"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE.\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/psglghana.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230#listItem\",\"position\":3,\"name\":\"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE.\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?cat=1#listItem\",\"name\":\"Uncategorized\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/#organization\",\"name\":\"Golden R Spiegel Mining\",\"url\":\"https:\\\/\\\/psglghana.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/psglghana.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/logo.png\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230\\\/#organizationLogo\",\"width\":732,\"height\":234},\"image\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?author=1#author\",\"url\":\"https:\\\/\\\/psglghana.com\\\/?author=1\",\"name\":\"psglghana\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230#webpage\",\"url\":\"https:\\\/\\\/psglghana.com\\\/?p=1230\",\"name\":\"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE. - Prestea Sankofa Gold Limited\",\"description\":\"1. INTRODUCTION This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/?p=1230#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/?author=1#author\"},\"datePublished\":\"2025-12-23T12:27:00+00:00\",\"dateModified\":\"2025-12-23T12:27:03+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/psglghana.com\\\/#website\",\"url\":\"https:\\\/\\\/psglghana.com\\\/\",\"name\":\"Golden R Spiegel Mining\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/psglghana.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE. - Prestea Sankofa Gold Limited","description":"1. INTRODUCTION This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to","canonical_url":"https:\/\/psglghana.com\/?p=1230","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/psglghana.com\/?p=1230#blogposting","name":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE. - Prestea Sankofa Gold Limited","headline":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE.","author":{"@id":"https:\/\/psglghana.com\/?author=1#author"},"publisher":{"@id":"https:\/\/psglghana.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/psglghana.com\/wp-content\/uploads\/2023\/04\/logo.png","@id":"https:\/\/psglghana.com\/#articleImage","width":732,"height":234},"datePublished":"2025-12-23T12:27:00+00:00","dateModified":"2025-12-23T12:27:03+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/psglghana.com\/?p=1230#webpage"},"isPartOf":{"@id":"https:\/\/psglghana.com\/?p=1230#webpage"},"articleSection":"Uncategorized"},{"@type":"BreadcrumbList","@id":"https:\/\/psglghana.com\/?p=1230#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/psglghana.com#listItem","position":1,"name":"Home","item":"https:\/\/psglghana.com","nextItem":{"@type":"ListItem","@id":"https:\/\/psglghana.com\/?cat=1#listItem","name":"Uncategorized"}},{"@type":"ListItem","@id":"https:\/\/psglghana.com\/?cat=1#listItem","position":2,"name":"Uncategorized","item":"https:\/\/psglghana.com\/?cat=1","nextItem":{"@type":"ListItem","@id":"https:\/\/psglghana.com\/?p=1230#listItem","name":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE."},"previousItem":{"@type":"ListItem","@id":"https:\/\/psglghana.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/psglghana.com\/?p=1230#listItem","position":3,"name":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE.","previousItem":{"@type":"ListItem","@id":"https:\/\/psglghana.com\/?cat=1#listItem","name":"Uncategorized"}}]},{"@type":"Organization","@id":"https:\/\/psglghana.com\/#organization","name":"Golden R Spiegel Mining","url":"https:\/\/psglghana.com\/","logo":{"@type":"ImageObject","url":"https:\/\/psglghana.com\/wp-content\/uploads\/2023\/04\/logo.png","@id":"https:\/\/psglghana.com\/?p=1230\/#organizationLogo","width":732,"height":234},"image":{"@id":"https:\/\/psglghana.com\/?p=1230\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/psglghana.com\/?author=1#author","url":"https:\/\/psglghana.com\/?author=1","name":"psglghana"},{"@type":"WebPage","@id":"https:\/\/psglghana.com\/?p=1230#webpage","url":"https:\/\/psglghana.com\/?p=1230","name":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE. - Prestea Sankofa Gold Limited","description":"1. INTRODUCTION This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/psglghana.com\/#website"},"breadcrumb":{"@id":"https:\/\/psglghana.com\/?p=1230#breadcrumblist"},"author":{"@id":"https:\/\/psglghana.com\/?author=1#author"},"creator":{"@id":"https:\/\/psglghana.com\/?author=1#author"},"datePublished":"2025-12-23T12:27:00+00:00","dateModified":"2025-12-23T12:27:03+00:00"},{"@type":"WebSite","@id":"https:\/\/psglghana.com\/#website","url":"https:\/\/psglghana.com\/","name":"Golden R Spiegel Mining","inLanguage":"en-US","publisher":{"@id":"https:\/\/psglghana.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"Prestea Sankofa Gold Limited -","og:type":"article","og:title":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE. - Prestea Sankofa Gold Limited","og:description":"1. INTRODUCTION This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to","og:url":"https:\/\/psglghana.com\/?p=1230","og:image":"https:\/\/psglghana.com\/wp-content\/uploads\/2023\/04\/logo.png","og:image:secure_url":"https:\/\/psglghana.com\/wp-content\/uploads\/2023\/04\/logo.png","article:published_time":"2025-12-23T12:27:00+00:00","article:modified_time":"2025-12-23T12:27:03+00:00","twitter:card":"summary","twitter:title":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE. - Prestea Sankofa Gold Limited","twitter:description":"1. INTRODUCTION This Scope of Work defines the requirements for the rehabilitation of the Trash Screen, CV07 Head Chute, Mill Spout Structure and the fabrication of Mill B trash screen and CV07 Chute at Prestea Sankofa Gold Limited. The works shall be executed in strict accordance with the attached Bill of Quantities (BoQ) and shall conform to","twitter:image":"https:\/\/psglghana.com\/wp-content\/uploads\/2023\/04\/logo.png"},"aioseo_meta_data":{"post_id":"1230","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2025-12-23 12:27:03","updated":"2025-12-23 12:30:59","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/psglghana.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/psglghana.com\/?cat=1\" title=\"Uncategorized\">Uncategorized<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE.\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/psglghana.com"},{"label":"Uncategorized","link":"https:\/\/psglghana.com\/?cat=1"},{"label":"SCOPEOFWORKFOR STRUCTURAL REHABILITATION AND FABRICATION WORKS ON MILL B TRASH SCREEN, CV7 HEAD CHUTE, AND MILL SPOUT STRUCTURE.","link":"https:\/\/psglghana.com\/?p=1230"}],"_links":{"self":[{"href":"https:\/\/psglghana.com\/index.php?rest_route=\/wp\/v2\/posts\/1230","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/psglghana.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/psglghana.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/psglghana.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/psglghana.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1230"}],"version-history":[{"count":1,"href":"https:\/\/psglghana.com\/index.php?rest_route=\/wp\/v2\/posts\/1230\/revisions"}],"predecessor-version":[{"id":1231,"href":"https:\/\/psglghana.com\/index.php?rest_route=\/wp\/v2\/posts\/1230\/revisions\/1231"}],"wp:attachment":[{"href":"https:\/\/psglghana.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1230"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/psglghana.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1230"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/psglghana.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}